Below mentioned are the steps that needs to be followed for
configuring the ledger setup and line property setup against the project group
and categories / category group.
Ledger posting setup
1.
Define the project group
a. Assumption:
i. Ledger
posting search direction – Project
ii. Line
property search direction - Project
2.
Define the ledger codes on the project group, if
you are certain.
(This will create following rules in ‘Ledger posting
setup’:
-
“Group-Project group-All-BLANK -> Ledger
code” rule)
3.
Get the list of categories
4.
Get the Chart of Accounts and analyse it well
5.
Define the basic rules of posting against the
categories and category groups
(Configure the ledger codes
against the categories. This will create following rule in ‘Ledger posting
setup’:
-
“All-BLANK-Table-Category -> Ledger Code”
rule AND
-
“All-BLANK-Group-Category group -> Ledger
Code”)
6.
Define the override rules against the project
group
(This will create following rule
in ‘Ledger posting setup’:
-
“Group-Project group-Table-Category -> Ledger
code” rule AND
-
“Group-Project group-Group-Category group ->
Ledger code”)
1.
Define the basic line properties initially, like
‘Billable’ and ‘Non-billable’.
-
Billable -> Chargeable, Accrue revenue and
Capitalise cost = CHECKED
-
Non-Billable -> Chargeable, Accrue revenue
and Capitalise cost = UN-CHECKED
2.
For all the overrides create new line properties
and define the specific rules in the matrix, keeping in mind the search
priority.
3.
Line property (Default line property) defined on
the ‘Category’ and ‘Category group’ will create following entries in the
‘Project / group line properties’:
4.
Line property (Default line property) defined on
the ‘Project group’ will create following entry in the ‘Project / group line
properties’:
5. Line property overrides will be defined directly
in the ‘Project / group line properties’. This will give rise to following
entries in ‘Project / group line properties’:
General points
1.
For the expense transactions specifically,
‘Default offset account for expenses’ needs to be setup.
2.
With all the steps above, the heart of project
module, the ledger posting setup combined with line property could be setup.
Make use of the ‘Line property’ setup (Capitalise cost checkbox) to maximise
the use of the category, instead of creating specific categories for posting
into P&L and BS.
3.
While following all the steps above make sure
that the entire posting tie down to the solution that is crafted. Play the
solution (accounting entries) in mind while configuring this setup in an excel
sheet.
4.
Do not assume that the ‘Ledger posting setup’
will work as designed. Sometimes the setup does not work as expected and hence
test each and every scenario in standard AX in your own VPC.
This post will be updated as and when some new insights are
experienced while doing this setup in any future projects / assignments.
Thanks
Sarang